Difference between revisions of "Breaker Panels"

From i3Detroit
Jump to: navigation, search
(Updated circuit descriptions)
(Updated circuit descriptions)
Line 97: Line 97:
 
| 40
 
| 40
 
| Rooftop AC and heat
 
| Rooftop AC and heat
| To east loft, including roof
+
| To east loft junction box, then to roof
 
|-
 
|-
 
| 15
 
| 15
Line 126: Line 126:
 
| N/A
 
| N/A
 
| 20
 
| 20
| Office plugs east
+
| Unknown
| To west loft (lower knockout)
+
| To west loft/attic (lower knockout)
 
|-
 
|-
 
| 22a
 
| 22a
 
| N/A
 
| N/A
 
| 15
 
| 15
| Plug left of breaker panel
 
 
| IT server rack power
 
| IT server rack power
 +
| Plug left of breaker panel
 
|-
 
|-
 
| 22b
 
| 22b
 
| N/A
 
| N/A
 
| 20
 
| 20
|  
+
| Not used
| To east loft, including roof
+
| To east loft junction boxes
 
|-
 
|-
 
| 23a
 
| 23a
 
| N/A
 
| N/A
 
| 20
 
| 20
|  
+
| Unknown
| To west loft (lower knockout)
+
| To west loft/attic (lower knockout)
 
|-
 
|-
 
| 23b
 
| 23b

Revision as of 21:25, 23 April 2012

Office Subpanel on South Wall of Shop Area

(Service from 100A breaker above main disconnect, next to water heater)

(Federal Pacific, use NA-NI or NC-NI breakers)

Location Second Pole Amperes Description Notes
1a N/A 15 E-room east bench plugs, west hallway plug, men's room plug Sheathed cable into joist above office
1b N/A 20 Crafts room east and south wall plugs, hallway plug between kitchen and bathroom, kitchen plugs on south wall but not on light switch Sheathed cable into joist above office
2 N/A 20 Tree House Through pipe in floor
3 N/A 15 Hallway emergency exit light, hallway light inside front door, kitchen lights and plug on light switch, crafts room light Sheathed cable into joist above office
4 N/A 20 Tree House Through pipe in floor
5 N/A 15 Fab room lights, e-room lights, e-room west bench plugs and west wall plug, bathroom lights and plug, men's room light Sheathed cable into joist above office
6,8 N/A 20 Bathroom heat/fan Sheathed cable into joist above office
7 N/A 15 Shop lights (mid-east) Leftmost of two switches left of breaker panel, to mid-east junction box
9 N/A 15 Shop lights over commons tables (near-east) Lower switch left of breaker panel, to near-east junction box
10 N/A 20 IT shelf over front door, east shop ceiling fans, lights at main door, emergency exit lights at main door, kitchen plugs on north and east walls Conduit into office wall left of breaker panel
11 N/A 15 Shop lights (far-east) Rightmost of two switches left of breaker panel, to mid-east junction box
12 N/A 20 Shop plugs on east wall (welding shop, tool crib) Through pipe in floor
13 N/A 15 North shop furnaces To near-east junction box
14, 16 18, 20 40 Rooftop AC and heat To east loft junction box, then to roof
15 N/A 15 Commons tables drop cords To near-east junction box
17 N/A 15 Theater spotlights (south outlet) To near-east junction box
19 N/A 15 Tool crib drop cord To mid-east junction box
21a N/A 15 South-east shop furnace To mid-east junction box
21b N/A 20 Unknown To west loft/attic (lower knockout)
22a N/A 15 IT server rack power Plug left of breaker panel
22b N/A 20 Not used To east loft junction boxes
23a N/A 20 Unknown To west loft/attic (lower knockout)
23b N/A 20 Theater spotlights (north outlet) To near-east junction box
24 N/A 20 Hallway lights (except light inside front door) To west loft (upper knockout)


Panel in SW Corner of Shop Area
(Pushmatic Electri-Center)

Location Second Pole Amperes Description Notes
1 2 100 Main
3 N/A 20 Shop plug next to Utilatub, switch to SW roof vent
4 N/A 20 West shop ceiling fan, shop plug under west loft, fab lab plugs
5 N/A 15 Rear shop lights and overhead power cord near utilitub No light switch
6 N/A 20 Not used
7 N/A 20 West shop emergency lights, west shop night lights
8 N/A 20 West shop lights No light switch
9 N/A 20 South shop wall plug next to broom rack
10 N/A 20 West shop lights No light switch
11 N/A N/A Spare No breaker installed
12 N/A N/A Spare No breaker installed
13 14 60 Subpanel in rear shop


Subpanel in NW Corner of Shop Area
(Resembles Pushmatic Electri-Center)

Location Second Pole Amperes Description Notes
1 N/A N/A Spare No breaker installed
2 N/A N/A Spare No breaker installed
3 N/A 20 Shop plugs on west wall
4 N/A 20 Shop plugs on north wall
5a N/A 20 Shop plugs on north wall, metalshop drop cord Through handy box over woodshop/metalshop doorway
5b N/A 20 Plugs on east wall Breaker suspected bad, load moved to 7
6 N/A 20 West shop wall, six southernmost plugs
7 N/A 20 Wood shop plugs on north wall
8a N/A 20 Lights in NE rear Through handy box over woodshop/metalshop doorway
8b N/A 20 Plugs on NE wall Conduit along north wall in loft
9 10 20 Roof exhaust fans
11 N/A 20 Roof exhaust next to beam Through handy box over woodshop/metalshop doorway
12 N/A 20 Outlets under north wall clock Through handy box over woodshop/metalshop doorway