Jan to develop training program
Make training kit
Make machine dust cover
Signage for cover
Develop user fee structure +
I need to take more photos and post them along with a link or two to some sort of airbrush how-to. I've never used one myself, so until I've accessed that content and played around with the airbrush, this page will remain a stub. +
Add a spring loaded hold down to the left (anvil) side +
When we get a working camera again, a picture would be nice... +
[[file:CraftRoomInventory_BlackAndDecker_SerialPlate_Medium.jpg|thumb|View of the model information/serial number plate.]] +
replace or repair light (droops)
wire in the power feed, light, and DRO so the wires are not in the way
run air line to the machine for coolant mister
repair coolant mister (droops)
buy and add pneumatic drawbar
buy and add drill-powered knee +
Get a power cord as it's missing.
buy: Bobbin (4) https://www.brother-usa.com/products/sa156
(One is on machine.) SA156
buy: Walking Foot SA140 +
C
#Install permanent air drop for the machine, check air humidity/oil/etc. (Complete)
#Install permanent power for the CNC side of the machine
#Clean out the water table (Complete 10/21/25. Alex Zurowski and Will Cunningham)
#Seal water table leaks (Complete 10/17/25. Alex Zurowski and Will Cunningham)
#Install limit switches (included with purchase, not currently installed)
#Develop class content for training (Complete 12/3/25. Alex Zurowski)
#Inventory consumables for the plasma cutter (Complete 10/21/25. Alex Zurowski and Will Cunningham)
#Determine per-minute rate for using the machine (Complete 11/17/25. Alex Zurowski)
#Put together instructions on swapping to the hand torch on the plasma cutter for hand work
#Create signs for Down/Training/Etc (Complete 11/17/25. Alex Zurowski)
#Email Plasma Green about water evaporation and refilling. (Complete 10/22 Will Cunningham)
+
* Officially approve this equipment to live in the CNC zone
* Populate this wiki page with useful information
+
* Figure out why it keeps saying it needs service
* Replace south end of bracket end with more C-shaped beam clamps
+
* Make Controller for Automated Temperature Control
+
* Get up and running again
* Make Controller for automated temperature control
+
* Install 3D scanner software (???)
* Install standalone transcription software ([https://handy.computer/ Handy] or [https://thewh1teagle.github.io/vibe/ Vibe] or [https://buzzcaptions.com/ Buzz] or something else)
+
* Plumb in vent ducting after AC blast gate
* Check if this belongs in New Elab for reflow
+
User guide, instructions, TBD +
* Obtain a table (acquired, set up March 20)
* Set up a computer with the software
* Train trainers
+
purchased use New Rotary AirLock* +
D
* Tie into shop dust collector
* Fix the acme rods so that they have a flat on the end that is connected to the shaft couplers.
+
Build a stand and bolt it to the floor +