Property:TODO
Jump to navigation
Jump to search
D
Needs a fitted cover, at some point.
How-to list for printing patterns and posters on the roll paper at full size. +
Set up and get working. +
* clean coin mech, and re-calibrate
* fix cooling system (fixed?)
+
* Continue welding trials with bi-metal blade
+
Might need plugging in. +
* Use slack and slack blame into some channel for announcements of pipeline status
* Better way to edit server-side configuration (instead of re-creating the containers)
+
E
Fix tensioner +
Better documentation and investigation into the design/execution toolchain--scheduled to be handled by the Coordinators.
Coordinators: Regularly check bobbin cutting blade. Order new part from repair shop if damaged.
Coordinators: Regularly check for nicks/scratches in needle plate. Sand out as necessary. Similarly, nicks in feet should be sanded lightly to reduce the burrs.
Kevin: Rewrite maintenance page as maintenance + troubleshooting; add link to Husqvarna troubleshooting section of manual (http://www.husqvarnaviking.com/SiteMedia/Products/Machines/Support/Designer_SE_Troubleshooting_EN.pdf).
Anyone: List available hoop sizes +
Signage for hard cover +
* Acquire ink cartridges.
* Test printer.
* Setup for fabric printing!
+
F
*Create and hang reservations sign, rules sign for above table.
*Make a reservation calendar in the CRM for the table.
+
# See if FANUC has released updated software.
# Get manuals and programming guides out of fileshare.
# Scan ownership/licensing documents and convert to PDFs for the wiki.
+
Presently powered from the row-2 light circuit. Fix that? +
* Clean up thermostat wiring
+
* Pilot light won't stay lit, replace thermocouple
* Or harvest for parts before pitching it
+
* New Thermostat
+
* Needs new motor
** Dayton 3M588A
*** 1/15 HP
*** 1050 RPM
*** Frame 42Y
** https://www.grainger.com/category/motors/ac-motors/hvac-ac-motors/direct-drive-blower-hvac-ac-motors?attrs=Frame%7C42Y~~HP%7C1%2F15~~No.+of+Speeds%7C1~~RPM+Range%7C1%2C001-1%2C100&filters=attrs
* Needs new bottom sheetmetal
* New Thermostat
+
* Replace switch box on furnace
+
G
Acquire replacement barrel lock with key for mounting hardware. +
Yet to do, short term:
*Coat battery terminals generously with anticorrosive.
*Replace the base-run switch.
Wishlist, long term:
*Diagnose and repair the platform-power connection.
*Redo the vinyl lettering on the machine panels and sides.
*Remove, sandblast, repaint, and reinstall the battery bays.
*Ammeter for charging/discharging current? +